Multi-objective scheduling of parallelly executed projects sharing resources

Authors

  • Krisztián Mihály University of Miskolc
  • Gyula Kulcsár University of Miskolc

DOI:

https://doi.org/10.35925/j.multi.2019.4.29

Keywords:

project scheduling, generation scheme, multi-objective, multi-project

Abstract

Nowadays the project-based task execution is widely used in many industrial areas, in different project lifecycle phases, from the design to the manufacturing and support. In real industrial environments typically several parallelly executed projects are sharing the same resources. The order of tasks execution is a key factor to achieve the defined goals. Our paper presents new scheduling models and methods to solve the presented problems.

Downloads

Published

2020-06-18