Methods of Choosing an Optimal Portfolio of Projects

Authors

  • Anatoliy Yakovlev National Technical University, Kharkov Polytechnic Institute
  • Maksym Chernenko

DOI:

https://doi.org/10.18096/TMP.2016.03.04

Keywords:

project, portfolio, economic evaluation, reallocation of resources, interim results, comprehensive studies, probabilistic factors

Abstract

This paper presents an analysis of existing methods for a portfolio of project optimization. The necessity for their improvement is shown. It is suggested to assess the portfolio of projects on the basis of the amount in the difference between the results and costs during development and implementation of selected projects and the losses caused by non-implementation or delayed implementation of projects that were not included in the portfolio. Consideration of capital and current costs components are required for the portfolio of projects efficiency calculation. An optimization model for a portfolio of projects is developed. Consideration of social and economic factors that contribute the integral assessment of the portfolio of project and methods for their calculation are proposed.

Author Biographies

Anatoliy Yakovlev, National Technical University, Kharkov Polytechnic Institute

Professor

Maksym Chernenko

Entrepreneur

References

BEHRENS, W. & Havranek, P.M., (1995): Rukovodstvo po otsenke effektivnosti investisiy [Investments efficiency guideline] Moscow: CJSC «Interexpert», Infra-M.

ILLARIONOV, A.V. & Klimenko, E.V. (2013): Portfel proektov: instrument strategicheskogo upravleniya predpriyatiem [Portfolio of projects: company’s strategic management tool]. Moscow: Alpika Pablimer.

KOZACHENKO, S.V. & Mitin, A.V. (1986): Ekonomika proektirovaniya sistem mashyn [Design economics of systems of machines]. Kiev: Tekhnika, 199 p.

MEYER, W.M. (2003): Rethinking Performance Measurement: Beyond the Balanced Scorecard Cambridge: Cambridge University Press. https://doi.org/10.1017/CBO9780511753824

MATVEEV, D.A., Novikov, D.A. & Tsvetkov, A.V. (2005): Modeli i metody upravleniya proektami [Models and method of project management]. Moscow: PM Soft.

PMI (2008): The Standard for Portfolio Management. 2nd ed. ANSI/PMI 08-003-2008. Newtown Square, PA, USA: Project Management Institute.

SHEFROV, A.A. (2003): Mnogoproektnoe upravlenie v proektnykh ogranizatsiyakh Rossii [Multi-project management in design companies of Russia]. Proceedings of the XVII World Congress on Project Management «Proektno-orientirovannye biznes i obshchestvo» [Project-oriented business and society]. Moscow: ІРМА, Lazernyy.

SOLOVEV, V.P. (2006): Innovatsyonnaya deyatelnost kak sistemnyy protsess v konkurentnoy ekonomike [Innovation activity as system process in a competitive economy] Kiev: Feniks.

STEFANOV N., Simeonova K., Kostov S.& Kachaunov S. (1975): Programmno-tselevoy metod v upravlenii. Teoriya i praktika [Program and Targeted Approach in Management: Theory and Practice] . Moscow: Progress

Downloads

Published

2016-12-15

How to Cite

Yakovlev, A. ., & Chernenko, M. . (2016). Methods of Choosing an Optimal Portfolio of Projects. Theory, Methodology, Practice – Review of Business and Management, 12(02), 33–38. https://doi.org/10.18096/TMP.2016.03.04